Mercedes C-Class

W203 since 2000 of release

Repair and operation of the car



Mercedes-Benz
+ Mercedes-Benz cars of class C (W-203)
+ Operation manual
+ Routine maintenance
+ Engine
+ Cooling system and heating
+ Power supply system and release
+ Engine electric equipment
+ Manual transmission
- Automatic transmission
   Specifications
   + The automated box of gear shifting 716.6
   - Automatic transmission 722.6
      Search of malfunctions - the general information
      Problems of the block of electronic control and the operating signals
      Removal and the AT installation with the hydrotransformer
      The AT electrohydraulic control unit (AT is established)
      Dismantling and assembly of the electrohydraulic control unit
      Dismantling and assembly of a plate of gear shifting
      Case of transmission and hydrotransformer
      Multidisk brakes of B2, B3 and gear wheel of blocking at "Parking"
      Dismantling and assembly of a back hollow shaft with the back coupling of a free wheeling
      Removal and installation of a multidisk brake B1 and oil pump
      Dismantling and assembly of the oil pump
      Dismantling and assembly of a multidisk brake of B1
      Dismantling and assembly of a multidisk brake of B2
      Dismantling and assembly of an output shaft with the central and back block of planetary gear wheels
      Removal and installation of multidisk couplings K1, K2 and K3
      Dismantling and assembly of coupling of K1
      Dismantling and assembly of the leading shaft with coupling by K2 and the forward block of planetary gear wheels
      Dismantling and assembly of coupling of K3
      The blocking mechanism at "parking"
      Removal and installation of the lever of the selector of gear shifting
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Removal and installation of the lever of the selector of gear shifting

Removal and installation of the lever of the selector of gear shifting (with the regime W/S switch)

39 — Laying
40 — Bolts (4 pieces)
97 — the Intermediate lever
S16/10 — the Switch of identification of the included transfer
S16/10s2 — the Switch of lamps of a backing
Y66/1 — the Electromagnetic drive of blocking of provisions of "R/P"

Drive of management of AT

1 — the Cable of the central block of gear shifting
2 — the gear shifting lever Handle
3 — the Control unit of the indicator of transfers
4 — the Central block of gear shifting
5 — the Tip of draft of switching
6 — Draft of gear shifting
7 — the Finger for draft connection

Removal

 PERFORMANCE ORDER

1. Remove the switching lever from the intermediate lever (97).
2. Remove the central console.
3. Turn off bolts (40).
4. Disconnect sockets and the electromagnetic drive of blocking of provisions of "R/P" (Y66/1) from the identification switch (S16/10), the switch of lamps of a backing (S16/10S2).
5. Remove the gear shifting selector lever assembled from a floor.


Installation

 PERFORMANCE ORDER

Installation is carried out as it should be, the return to removal. Check laying (39) and its state for correctness of installation if it is necessary, replace it.